Module prestashop pour votre site e-commerce
Module will help to admin to change their order status without open it. Status can be changed by order list by selecting dropdown. Even when order status will change an email will send to customer regardin order status. It will save admin's time.
Les plus de ce module Prestashop
Vous fait gagner du temps
- Admin can easily change order status.
- Admin can easily check status of the order from the order list.
- Email will be send when order status changed by drop down.
- It will save time.
- Easy to manage all order status by order list.
- Admin can manage different profiles permission for this module.
- Only selected admin profile will able to update the order status directly from the order list page.
Installation
See the installation process below -
- Step :1 Upload the module zip to backed.
- Step : 2 Install it and no configuration required.
- Step : 3 See the order list. New changes are there :) :)
Lien associé à cet article :
https://addons.prestashop.com/fr/gestion-commandes/25741-change-order-status-directly-from-order-list.html